ITC Michigan, through its ITCTransmission subsidiary, constructed approximately three miles of 120,000 volt (120kV) double-circuit transmission line to connect the State and Pioneer substations. This project will support electric reliability and increase capacity in the Ann Arbor area. Construction was completed in early 2020.
The State-Pioneer project is an example of ITC’s ongoing commitment to the operational efficiency and reliability of Michigan’s high-voltage transmission grid. The company has invested more than $4.7 billion in capital project maintenance and transmission infrastructure improvements in Michigan since 2003. These investments are improving the reliability and safety of the transmission infrastructure while ensuring its ability to meet new energy demands.

Project Approach
ITC’s approach to transmission line development takes into consideration the unique nature of every project. Projects are assessed individually for safety, reliability, cost-effectiveness, environmental impacts and community impacts to determine the best transmission solution for each project.
Public Participation
ITC recognizes the critical role that local residents, landowners and communities play in reviewing and hosting new electric transmission lines. ITC is committed to open, honest and frequent communications with landowners and local governments. We work respectfully with landowners throughout the design and construction process to identify possible routes for the project that minimize impacts to their properties.
WANT TO SEE ALL THE PROJECT DETAILS?
WHY IS THIS PROJECT NECESSARY?
As in much of the United States, the electric infrastructure serving the Ann Arbor area was constructed decades ago and was not built to support modern-day demands. This can lead to inconvenient, and sometimes costly, power outages. The electric system improvements will enhance the reliability of electric service to Ann Arbor residents and businesses, and create additional capacity to support growth throughout the region.
WHEN WILL THIS PROJECT START AND HOW LONG WILL IT TAKE?
Construction starts after the route is determined, all necessary real estate rights are secured and engineering design is completed. Our goal was to complete construction in early 2020 to meet the anticipated energy needs of the region.
WHERE WILL THE PROJECT BE LOCATED?
The State-Pioneer transmission line extends from the State substation in Ann Arbor to the Pioneer substation in Pittsfield Township.