ITC’s METC subsidiary is upgrading electricity transmission infrastructure in Michigan by rebuilding approximately 16 miles of its Vestaburg – Alma 138 kV transmission line, replacing the existing structures with new monopoles designed for higher-rated conductor (wire) and optical ground wire (OPGW). Additionally, METC will replace the conductor on 3 miles of the adjacent Eureka – Vestaburg line. Construction will begin in Q4 2020 and be completed in Q1 2021.