Meyer Substation

ITC Michigan, through its Michigan Electric Transmission Company, LLC (METC) subsidiary, will construct a new substation named Meyer in Tallmadge Twp. The station will connect to the existing Ludington –Tallmadge 1 and Argenta –Kenowa 345,000 volt (345 kV) transmission lines, and the Cobb –Tallmadge 2 138,000 volt (138 kV) transmission line. Construction is expected to begin in Q1 2019 and be completed by the end of 2019.