Location: MICHIGAN

  • Lambton-St. Clair Line Upgrade

    Lambton-St. Clair Line Upgrade

    Crossing an International Waterway During spring 2017, ITC and Ontario-based Hydro One began work to upgrade the communication path for approximately four miles of 230,000 volt (230 kV) and three miles of 345,000 volt (345 kV) lines connecting the St. Clair Substation in East China Township, Mich., to the Lambton Transformer Station #2 in Courtright,…

    Read More →

  • Long Rapids Project

    Long Rapids Project

    METC will build a new 138,000 volt (138 kV) substation called Long Rapids, and relocate its transmission infrastructure from the nearby Alpena substation to the new substation, including the Alpena – Airport, Alpena – Iosco and Alpena – Rockport 138 kV lines. Additionally, METC will rebuild approximately 6.3 miles of the Airport – Alpena (Long…

    Read More →

  • Bloomfield-Hamlin Transmission Line Rebuild

    Bloomfield-Hamlin Transmission Line Rebuild

    ITC Michigan, through its ITC Transmission subsidiary, is upgrading its approximately 4 mile, 120,000 volt (120 kV) Bloomfield – Hamlin transmission line that serves the Auburn Hills, Pontiac and Rochester Hills communities. This project will improve the reliability of high-voltage electrical service in the area by replacing the current 120kV double-circuit towers with 230 kV…

    Read More →

  • Blue Water Reinforcement Project

    Blue Water Reinforcement Project

    ITC Michigan is committed to serving customers and communities by providing safe, secure, reliable electricity transmission service to meet their needs. In Southeast Michigan, ITC has constructed two new 345kV substations, rebuilt four miles of an existing 120kV line, and replaced a number of structures on lines connecting to the new stations. Together, these infrastructure improvements…

    Read More →

  • Butters Substation

    Butters Substation

    ITC Michigan, through its Michigan Electric Transmission Company (METC) subsidiary, will build a new substation, named Butters, in the City of Coldwater. It will connect to the existing Coldwater – Michigan Ave 138,000 volt (138 kV) transmission line. Substation construction is expected to begin in Q2 2020 and line construction will begin in Q3 2020….

    Read More →

  • Campbell – Tyler Project

    Campbell – Tyler Project

    ITC Michigan, through its Michigan Electric Transmission Company, LLC (METC) subsidiary, is upgrading electricity transmission infrastructure in west Michigan. METC will build approximately 4 miles of new 345,000 volt (345 kV) transmission line in an existing utility corridor. Additionally, new equipment will be installed in the Campbell and Tyler substations to facilitate the connection of…

    Read More →

  • Coldwater Transmission Project

    Coldwater Transmission Project

    To support economic growth in southern Michigan, ITC Michigan, through its Michigan Electric Transmission Company (METC) subsidiary, is constructing new substations and transmission lines in the City of Coldwater, and in Coldwater, Girard and Union Townships. The project is being constructed in two phases: Phase one of the project consists of a new substation called Newton…

    Read More →

  • Blendon – Substation Conversion

    Blendon – Substation Conversion

    ITC Holdings Corp., through its Michigan Electric Transmission Company, LLC (METC) subsidiary, is upgrading electricity transmission infrastructure in west Michigan. METC has retired its aging Blendon Substation and worked with Wolverine Power Cooperative to acquire its nearby 69,000 volt (69 kV) ring bus station. METC converted the 69 kV station to 138 kV, and relocated…

    Read More →

  • Beecher – Samaria Transmission Line Rebuild

    Beecher – Samaria Transmission Line Rebuild

    ITC Michigan, through its Michigan Electric Transmission Company (METC) subsidiary, has rebuilt approximately 22 miles of its Beecher – Samaria 138,000 volt (138kV) transmission line. This project improves the reliability of high-voltage electrical service in the area by replacing the current wood H-frame and steel lattice structures with double-circuit steel monopoles. Construction was conducted in…

    Read More →

  • Battle Creek-Island Road Transmission Line Rebuild

    Battle Creek-Island Road Transmission Line Rebuild

    Portions of the electric transmission grid in Michigan, including the Battle Creek-Island Road 138,000 volt (138kV) transmission line, were built more than 50 years ago and have experienced minimal investment since that time. As a result, this line has become increasingly unreliable and costly to maintain as growing demand for electricity and outdated infrastructure technology…

    Read More →

test