ITC Michigan, through its ITCTransmission subsidiary, completed the Thumb Loop high-voltage transmission project in May 2015. ITC invested $510 million to build the 345,000 volt (345 kV) line, which now serves as the backbone of a system designed to meet the identified maximum wind energy potential of Michigan’s Thumb region. It also is contributing to regional system reliability and facilitating wholesale market competition.

Thumb-Loop