Planning Criteria

ITC performs the planning of its transmission systems in an open and transparent manner through its participation in the Midwest Independent System Operator ("MISO") Transmission Expansion Planning process and the Southwest Power Pool ("SPP") Integrated Transmission Planning ("ITP") process. ITC Midwest operates under the MISO planning process.